PSA build code calculator

Convert between PSA ORGA/RPO build codes and calendar build dates.

PSA vehicle data

ORGA / RPO build code

Convert between a PSA build date and its corresponding ORGA/RPO day code.

Conversion result
select a date or enter a code
Reference date 8 November 1976 The build code is the number of elapsed days from the PSA reference date. Factory suffix digits, where present, are not part of this date conversion.
Workshop note

Some labels append factory or production-line digits to the day code. This calculator converts the date portion only.